The Subcontractor Certificate of Insurance (COI) Checklist: Endorsements, Limits, and Global Equivalents
A certificate of insurance is not a generic PDF. It is a set of claims about named entities, policy periods, limits and endorsement wording. This checklist shows what reviewers check first, what commonly causes rejection, and how the same evidence is described outside North America.
Why COIs get rejected before mobilization
Subcontractor onboarding rarely stalls because the work is unclear. It stalls because the certificate does not say what the contract says. A project manager reads the insurance requirement as 'general liability and workers' compensation'. The contract may also require the general contractor to be named as an additional insured, a waiver of subrogation in favour of the owner and GC, primary and non-contributory wording, and a specific aggregate limit. Those are separate promises, and a certificate that lists only a carrier and a policy number does not make them.
The second failure is version drift. A subcontractor with five GC relationships may email five slightly different PDFs. One names the wrong legal entity. Another shows a policy that renewed last month. A third has the correct limits but the wrong project. When each GC keeps its own copy, nobody can tell which version is current, and the expiry date is discovered only when a draw is held or a site access request is refused.
A portable record does not remove the need for contract-specific endorsements. It does make the current evidence, the named insured, the policy period and the confirmation source visible in one place, so a reviewer can ask a precise question instead of chasing a file.
- The certificate must name the legal entity that signed the subcontract, not a trading name or a parent company unless the contract says so.
- The policy period must cover the work dates, including any maintenance or warranty period the contract adds.
- The endorsement wording matters as much as the certificate page; a checkmark without the endorsement can be rejected.
- The project-specific requirement should be written down before the subcontractor asks a broker to reissue anything.
The six fields GCs check first on a certificate
| Certificate Item | What GCs Look For | Common Rejection Reason |
|---|---|---|
| Named Insured | The exact legal entity that signed the subcontract, matching the registration or tax record. | A trading name, a parent entity, a misspelling or an old company name that no longer matches the contract. |
| Policy Effective & Expiry Dates | A policy period that covers the full work window, including mobilisation and any warranty period. | A certificate that expires before the project starts, or a renewal that has not reached the reviewer. |
| General Liability & Workers' Comp Limits | Each limit the contract requires, per occurrence and aggregate, plus the workers' compensation evidence for the relevant jurisdiction. | A limit that is below the contract threshold, a missing aggregate, or workers' compensation shown for the wrong state or province. |
| Additional Insured Endorsement | The GC, owner or other required entity named by endorsement, with the project or blanket wording the contract accepts. | A certificate that names the GC in a description box without the underlying additional-insured endorsement. |
| Primary & Non-Contributory Wording | Language stating the subcontractor's policy responds first and does not seek contribution from the GC's policy. | The phrase appears on the certificate but not in the endorsement, or it is limited to a different entity. |
| Waiver of Subrogation | A waiver in favour of the required entities and, where the contract asks, the owner and GC for the project. | No waiver, a waiver limited to one entity, or wording that conflicts with the additional-insured endorsement. |
Global insurance equivalents across regions
The certificate vocabulary changes by market. A reviewer who only knows ACORD 25 will misread a UK employers' liability certificate, a German public liability policy or a UAE trade licence package. The underlying questions stay the same: who is insured, for what period, for which activity, with what limit, and who can rely on the cover? The evidence that answers them does not.
| Region | Primary Liability Evidence | Worker Injury / Statutory Cover | Common Local Additions |
|---|---|---|---|
| North America | ACORD 25 certificate of liability insurance; ACORD 28 for property where required. | Workers' compensation certificate for the state or province of the work. | Additional insured and waiver endorsements, W-9 or Canadian tax registration, state or provincial trade licence. |
| United Kingdom | Public liability certificate; professional indemnity where the contract requires it. | Employers' liability certificate, which is compulsory for most employers in Great Britain. | CDM 2015 role evidence, health and safety policy, trade registration such as Gas Safe, CSCS or equivalent competence cards. |
| European Union | Public liability and, where requested, professional liability or professional indemnity. | Statutory accident or employers' liability cover in the member state of employment. | Posted-worker A1 certificates, posting declarations, trade or craft registration, VAT identification. |
| GCC | Public liability certificate, often alongside project-specific cover. | Workmen's compensation or employer's liability as required by the contract and local labour rules. | Trade licence, commercial registration, wage-protection evidence, worker residency and sponsorship documents. |
How RelyTia maps to this checklist
RelyTia is built around one portable subcontractor record rather than a separate upload folder for every GC. Subcontractor Free includes 3 active global documents and 1 active passport link. Passport is $49 per month or $499 per year with 10 active global documents, multi-jurisdiction licences and broker confirmation. Pro is $99 per month or $1,009 per year with unlimited documents and licences, the Finance suite and the compliance copilot. Paid plans include a 14-day cardless trial.
The workflow is deliberately explicit about provenance. A new upload is visible immediately as Self-reported. Broker-confirmed is a separate label recorded only when the broker, surety agent or authorized issuer confirms the certificate through a one-time email code or an uploaded issuer approval. AI extraction may draft fields and confidence scores, but it cannot set a confirmation label.
RelyTia records evidence and source confirmations; it does not certify compliance or act as an insurer, broker, law firm or payment processor. Contract wording and coverage decisions remain with the GC, the subcontractor and their advisers.
- One portable record: the same company identity, insurance evidence and expiry dates can be shared with several GCs without re-keying the company profile.
- Expiry tracking: the record keeps the policy period visible and raises reminders before expiry, so a renewed certificate replaces the old one instead of disappearing into an inbox.
- Self-reported versus Broker-confirmed: the two labels are kept separate, so a reviewer knows whether the subcontractor uploaded the file or the source confirmed it.
- Revocable per-GC passport links: a subcontractor can share selected documents with one GC and revoke that access without changing the record or revoking another relationship.
- Project-specific requirements: a GC can ask for additional insured wording or a higher limit on a project without turning that request into a permanent change to the company record.
Frequently asked questions
Insurance wording is contract- and jurisdiction-specific. The answers below explain the workflow distinction; they are not legal or insurance advice.
Frequently asked questions
What is the difference between Additional Insured and Waiver of Subrogation on a COI?
Additional insured status gives the named GC or owner a right to rely on the subcontractor's policy for the project. Waiver of subrogation gives up the insurer's right to recover a paid loss from the GC or owner. They are separate endorsements. A certificate that lists both phrases without the supporting endorsement may not actually provide either protection.
Why do General Contractors outside North America ask for Public Liability and Employers' Liability instead of an ACORD 25?
ACORD 25 is a North American certificate format. UK and EU buyers usually ask for the local liability certificate, and UK employers' liability is a distinct statutory cover. GCC buyers often start with the trade licence and local registration, then add public liability and workmen's compensation. The underlying questions are similar, but the document names and regulatory basis differ.
Can a subcontractor share one insurance record with multiple General Contractors?
Yes. A portable record can hold the current certificate and expiry dates once, then share selected documents through separate revocable links. A project-specific endorsement still has to be requested for the project that needs it; sharing the record does not create coverage or amend the policy.
Does RelyTia verify that my insurance policy is legally active?
No. RelyTia records the document, its stated fields and expiry date, and whether a broker or issuer confirmed it at source. It does not contact the insurer to verify coverage, interpret policy wording, or certify that the policy is active. The GC and its advisers remain responsible for the insurance decision.